Game Dev

Architecture

ArchViz

Hegelallee 22-24


A complex of three buildings. Two of them were old and heritage listed. The third was an unfinished new block. The former investors went out of business.

A new investor wanted to turn the complex into a retirement village with a wellness centre attached.

My job was the design and documentation for one of the old buildings and documentation for the new block.

11 images :: HP :: Potsdam :: Appartments :: 2005


image

Building 24

Design and Documentation

This building had a heritage listed front view. It had a difficult floor plan. By turning the main stairs 180 degrees around the problems could be solved.

It contains now 19 1-2 bedroom apartments for elderly tennants.

Procurant Homepage (German) ...

Blueprint: Elevations

image

Ground Floor

imageimage
Previous image (02):

This blue print was only used as an overview sheet. It contains scaled down drawings from all elevations.


Above image:

The ground floor documentation drawing. (Here: scaled down to A3).

I usually have scaled down versions of the original drawings to look at in meetings or to send as attachments.

pdf file (266 kb) ...


Top Floor

Above right image:

The top floor documentation drawing. (Here: scaled down to A3).

pdf file (286 kb) ...


image

Detail of the new stairway

A 1:20 detail of the new set of stairs. Click on the image to see a larger version in the gallery (gif).

image

Detail of the roof balcony

A 1:20 detail of the top floor balcony. Click on the image to see a larger version in the gallery (gif).

image

Detail of a balcony

A 1:20 detail of a balcony. Click on the image to see a larger version in the gallery (gif).

image

Presentation of the new stairway.

A 3ds max render of the new staircase. This was the first time I used 3ds max to show the client how something might look like.

House 22

imageimage
Above image:

This half finished new building had to be redesigned to accomodate serviced appartments. It was supposed to be an appartment block but a former investor run out of money during construction.


Above right image:

The building after the transition and almost finished. Landscaping is still missing.
A larger meeting room and reception has been added in front of the building.


image

Ground Floor

Documentation drawing of the ground floor of building 22. Here scaled down to fit onto a A3 sheet.

Blue print (pdf 900 kb) ...

Top of page